Record what one loader ended the step resident, for the shared ceiling.
Belongs in the step's finally: the measurement must happen on the failure
and abort paths too, or a loader that threw mid-load keeps its pre-load
allowance and the budget drifts.
Record what one loader ended the step resident, for the shared ceiling.
Belongs in the step's
finally: the measurement must happen on the failure and abort paths too, or a loader that threw mid-load keeps its pre-load allowance and the budget drifts.